RISK MANAGEMENT IN THE ANDIR RETENTION BASIN PROJECT: A QUALITATIVE CASE STUDY
Keywords:
Risk Management, Construction Project, Infrastructure, Risk MatrixAbstract
Mega infrastructure projects in Indonesia face a complex landscape of uncertainty, often hindered by significant non-technical risks such as land acquisition and financing issues. Systematic risk management is crucial to ensure project success. This research aims to comprehensively dissect and map the risk landscape in a case study of the Andir Retention Basin Project, which reflects these challenges. Using a qualitative case study approach, this study gathered primary data through in-depth interviews with key stakeholders. Through participatory discussions, each risk was identified and assessed based on its probability and impact levels. The assessment results were then mapped onto a risk matrix to determine priority levels and formulate appropriate response strategies. The research identified 12 main risks, with five categorized as Very High: Land Acquisition, Project Financing, Regulatory Changes, Bad Weather, and Work Accidents. The main conclusion of this study is that the project's risk profile is dominated by non-technical and external factors. This finding confirms that the success of modern infrastructure projects depends not only on technical excellence but also on the management's ability to proactively navigate social, financial, and regulatory complexities.
References
Lengkong, B. C., Malingkas, G. Y., & Dundu, A. K. T. (2025). Analisis dan strategi mitigasi risiko dalam implementasi proyek konstruksi hijau. Jurnal Konstruksi dan Infrastruktur, 13(1), 1–12.
Pratama, A. R., & Syafri, E. (2025). Identifikasi dan mitigasi risiko konstruksi jalan tol menggunakan metode risk breakdown structure. Jurnal Konstruksi, 22(2), 45–54.
Ashadi, R. F., Citra, Z., & Sari, I. P. (2023). Penilaian risiko proyek infrastruktur Kereta Api Cepat Jakarta–Bandung. CIVED, 10(2), 564–577.
Dewi, A. A. D. P., Ariana, I. K., & Wismantara, I. (2025). Analisis kendala manajemen risiko proyek pada pembangunan infrastruktur. Jurnal Teknik Sipil dan Perencanaan, 14(1), 75–88.
Renault, B. Y., & Agumba, J. N. (2016). Risk management in the construction industry: a new literature review. MATEC Web of Conferences, 49, 00008. https://doi.org/10.1051/matecconf/20164900008
Syafa’at, R., Wahyuningtyas, A., & Sutrisno, R. (2025). Analisis manajemen risiko pada proyek pekerjaan konstruksi jaringan pipa air limbah Jakarta Sewerage Development Project (JSDP) Paket 5 Zona 1. Unissula Repository. https://repository.unissula.ac.id/40332/1/Magister%20Manajemen_20402300304_fullpdf.pdf
Alia, F., Al-Amin, M. B., & Kurnia, A. Y. (2019). Evaluasi aspek teknis prasarana kolam retensi untuk pengendalian banjir di Kecamatan Sukarame, Kalidoni, Kemuning dan Ilir Timur II Kota Palembang. Seminar Nasional AVoER XI Fakultas Teknik Universitas Sriwijaya.
Ekaterina, O. (2008). Risk management in construction projects: a comparative study of the different procurement options in Sweden. Luleå University of Technology.
Obadimu, O. O., Ezeokoli, F. O., Okoli, O. G., & Oluwatayomi, D. F. (2024). An examination into the impact of risk management techniques on building construction projects. International Journal of Advances in Engineering and Management, 6(12), 318-325. https://doi.org/10.35629/5252-0612318325
Novita, E. K., Aisyah, R., & Rahayu, W. (2025). Analisis manajemen risiko proyek dengan metode zero-one (Studi Kasus: Proyek Pembangunan Gedung Perpustakaan Universitas Islam Internasional Indonesia Depok). Matriks Teknik Sipil, 13(2), 101–112.
Ervianto, W. I. (2017). Tantangan pembangunan infrastruktur dalam proyek strategis nasional Indonesia. Seminar Nasional Teknik Sipil, Universitas Atma Jaya Yogyakarta.
Idris, A. M. S. (2025). Rencana Pembangunan Jangka Panjang Nasional Tahun 2025–2045, Isu Strategis Wilayah Indonesia. Rencana pembangunan jangka panjang nasional tahun 2025—2045